Northeast Trailworks led the Design, Permitting, and Volunteer Crew in constructing a key ½ mile connector trail in Beverly, MA. Terrain was varied and soils were mixed, and slopes generally mild to moderate. Once flagged, reviewed, and approved Dave led the project plan and organized the trail work days. Glen & Dave led the layout and reviewed hand built multi-use trail best practices with the enthusiastic crew.

One end of the trail is right at a shared-use gravel parking lot, the other end connects into the existing system in the Montserrat Neighborhood.